Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

Two Bolts Three Bolts Manual Polish Clamp

Product Details

Product Description

Two Bolts Three Bolts Manual Polish clamp

Operation manual of
Manual Polish clamp

1. The specification for installing the polished rod clamp must be consistent with the nominal value of polished rod.
2. Install according to the mark ↑ on the polished rod Clamp. Do not install it reversely.
3. Wipe the clamped position clean.
4. Tighten the fastening nut, torque force ≥ 280n, M.
5. During the installation of the polished rod Clamp, it is absolutely not allowed to operate in violation of regulations, and it is strictly prohibited to put both hands on the upper and lower sides of the polished rod Clamp.
6. After installation, brake to slow down the smooth rod clamp and slowly load it to avoid unnecessary damage caused by excessive impact load of the smooth rod clamp.
Executive standard: SY / T 5029-2013 API 11
The product drawings are as follow
FAQ
Q: How can I place order?
A:You can contact us by email about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.

Register Your Company