Model NO. | 121131 | Surface Treatment | Without Processing |
Operation Pressure | Atmospheric Pressure | Material | Alloy, Alloy Steel |
Journal Surface Roughness | 0.63-0.16u03bcM | Mode | 121131 |
Appearance Shape | Round | Sur.H | 35 HRC |
Materila | 1.6959 | Unspecified Tolerances | ISO 2768 |
Journal Diameter Dimensional Accuracy | It6-It9 | Shaft Shape | Stepped Shaft |
Axis Shape | Straight Shaft | Load | Drive Shaft |
Stiffness & Flexibility | Flexible Shaft | Transport Package | Wooden Case |
Specification | 2200 mm*600 mm*650 mm | Trademark | SEACO |
Origin | China | Production Capacity | 5000PCS/Year |
There are tons of material to remove for the main shafts and highly productive turning solutions generate substantial improvements. From a machining point of view, the forged surface demands inserts with secure performance and high temperature resistance due to the long contact times.
Manufacturing deep and precise holes is always a technical
challenge, where we are proud to help out. Through 50 years
of deep-hole drilling experience, you can feel assured that
our tools will do the job. Furthermore, our technical
specialists will be there to assist you with solutions.
CANRIG TESCO VARCO TYPE Top Drive Main
Shaft W/Landing Collor 121131
MAIN SHAFT W/LANDING COLLOR "VERCO" TOP DRIVE MOD
121131
Details size pls reference
the drawing.
Packing
CANRIG TESCO VARCO TYPE Top Drive Main
Shaft W/Landing Collor 121131
MAIN SHAFT W/LANDING COLLOR "VERCO" TOP DRIVE MOD
121131
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you
confrm our Pl, we will request you to pay.T/T (HSBC
bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we
discuss order details, production details by email or
TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement.
If there are some defective items, we usually credit to
our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have
spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |