Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

MMA Two-Component High-light Pavement Marking material (MMA Cold Plastic)

FOB Price 2846 - 3769 USD / ton
PortShanghai
Packaging25 kg/bucket (spraying paint) or 30 kg/bucket (screeding paint),0.9 ton/tray
Lead Time15 dyas

Quick Details (View All)

Density(g/cm3)2.0

Product Details

Advantage:

* Material from Evonik Industries;

* Excellent brightness and night visibility;

* Anti-crack & strong tenacity;

* Wear resistance is 2 times better than thermoplastic marking;

* Excellent aging resistance;

* Environment protection,100% solid content and no volatile substances.

Construction mode includes spraying application and screed application and extruded application.

View File

Consumption Actual consumption depends on the thickness of marking & Roughness of pavement & Local temperature environment )

surface temperature 25℃

Spraying application

(0.5mm-0.7mm)

Screeding application

(1.2mm-1.5mm)

thickness

0.6mm

1.2mm

paint

1kg/㎡

3kg/㎡

Hardner

15g/㎡

45g/㎡

primer

150g/㎡

Glass beads

0.5kg/㎡

0.5kg/㎡

Technical Data:

·Retroreflective valve:≥350 mcd(white)

·Curing time:≤15minutes

·Density (g/cm³):2

·Abrasion resistance:≤35mg

Color:White/Yellow /Customize other colors

The matters needing to attention during the construction

1. Dry & Clean & flat of road surface.

2. Damaged road should be repaired before applying.

3. Before applying,should add the hardner according to the ratio to the MMA two-component

(Component B) pavement marking paint,then stir well.

4. Avoid breathing vapors,eyes and skin should not touch the coating.

5. During Construction,eating and drinking and smoking is prohibited.

Attention of construction

1. Clean and dry road surface.

2. Construction environment temperature is about 10℃ to 40℃,surface temperature

generally is above 5 ℃。

3. The curing time depends on the consumption of curing agent & the temperature of

construction environment,but has nothing to do with the thickness of the coating.

4. Strictly prohibited from direct sunlight during transport and storage,stored in

ventilated and shade and dry place,the storage temperature should be controlled in 0℃

to 40℃.

5. During screeding application,it is recommended that two scraper buckets be equipped for continous replace.

View File View File View File

Spraying application

Screeding application

Vehicle-mounted spraying application

View File View File View File

Register Your Company