Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

MMA Two-Component Colorful anti-skid Pavement Marking material (MMA Cold Plastic)

FOB Price 3538 - 3846 USD / ton
PortShanghai
Packaging25 kg/bucket,0.9 ton/tray
Lead Time15 days

Quick Details (View All)

Anti skid BPN value70 Gelation time (min)20
The method of adhesive property about base material4 grade Drying time of non stick tire (h)0.4

Product Details

Advantage:

* Good visuality and colorful;

* Good anti-skid and can improve the pavement anti-skid in the rainy day;

* No VOC,environmental protection,energy conservation

* Compressive strength,anti-wear,good adhesion;

* Excellent aging resistance ,cold resistance;

* Weather resistance,anti-oil,anti-acid,anti-alkali.

This materials has four construction modes.

First (Three layers -- covering antiskid layer)

During construction:

Step 1. Worker use scraper with toothed to coat primer;

Step 2. At the same time to strew the anti-skid aggregates above the coating primer;

Step 3. After the primer drying,sweeping the redundant anti-skid aggregates on the primer

and use the paint or resin as the top coat.

View File

Consumption (Actual consumption depends on the roughness of Pavement )

The thickness of colorful anti-skid road marking is 3mm

Consumption (surface temperature 25℃)

Primer

Top coat

Aggregates

Hardner

2.5kg/㎡

1kg/㎡

4.5kg/㎡

3g/㎡

Second (Two layers)

During construction:

Step 1. Worker use the scraper with the toothed to coat primer;

Step 2. At the same time to strew the anti-skid aggregates above the coating primer;

Step 3. After the primer drying,sweeping the redundant anti-skid aggregates on the primer.

View File

Consumption (Actual consumption depends on the roughness of Pavement )

The thickness of colorful anti-skid road marking is 3mm

Consumption (surface temperature 25℃)

Primer

Aggregates

Hardner

2.5kg/㎡

4.5kg/㎡

4g/㎡

Third(single layer--Can add the sand)spraying application

During construction,using the worker or with the air assisted spraying equipment to overlay the road.

View File

Fourth (Hybrid)

During construction:

Step 1.Mix the paint & aggregate and the mixture evenly;

Step 2.Then worker use the scraper to screed evenly;

Step 3.Finally using roller to evenly brush the surface of marking.

View File

Technical Data:

·Curing time:≤60 minutes

·Anti wearing valve:≤10mg

·Anti slide swing valve:≥65BPN

·Flexibility:≤1

·Crack resistance in low temperature:In -40℃ no crack after three cycles

Color:Various colors / Customize color

Register Your Company