Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

MMA Two-Component Anti-fouling Pavement Marking material (MMA Cold Plastic)

FOB Price 3077 - 3923 USD / ton
PortShanghai
Packaging25 kg/bucket (spraying paint) and 30 kg/bucket (screeding paint) and 0.9 ton/tray
Lead Time15 days

Quick Details (View All)

Density(g/cm3)1.7 Cure time (min)28
Abrasion Performance / mg (200r/1000g reduce weight)23 Adhesive properties4 grade

Product Details

Advantage:

* Excellent weather resistance;

* Anti-wear & anti-crack;

* Line film is densification and not easy to hide the dirt;

* Strong UV resistance;

* Low VOC and no heavy metal content.

Construction mode includes spraying application and screed application and extruded application.

View File

Consumption (Actual consumption depends on the thickness of marking & Roughness of pavement & Local temperature environment )

surface temperature 25℃

Spraying application

Screeding application

Mixed mode

thickness

0.6mm

1.2mm

0.5-0.7mm

Consumption

1kg/㎡

3kg/㎡

Sealing coating: 2kg/㎡

Coating:1kg/㎡

Hardner

15g/㎡

45g/㎡

45g/㎡

primer

150g/㎡

150

Technical Data:

·Anti-fouling value:≤15

·Curing time:≤15minutes

·Density (g/cm³):1.7

·Chromaticity performance (white):≥85

·Abrasion resistance:≤35mg

·Anti wearing value:18

Color:White/Yellow /Customize other colors

Typical installation areas:

Urban Rd(very strict to the clean),mining area

The matters needing to attention during the construction

1. Dry & Clean & flat of road surface.

2. Damaged road should be repaired before applying.

3. Before applying,should add the hardner according to the ratio to the MMA two-component

(Component B) pavement marking paint,then stir well.

4. Avoid breathing vapors,eyes and skin should not touch the coating.

5. During Construction,eating and drinking and smoking is prohibited.

Attention of construction

1. Clean and dry road surface.

2. Construction environment temperature is about 10℃ to 40℃,surface temperature

generally is above 5 ℃。

3. The curing time depends on the consumption of curing agent & the temperature of

construction environment,but has nothing to do with the thickness of the coating.

4. Strictly prohibited from direct sunlight during transport and storage,stored in

ventilated and shade and dry place,the storage temperature should be controlled in 0℃

to 40℃.

5. During screeding application,it is recommended that two scraper buckets be equipped for

continous replace.

View File View File View File

Screed application

Spraying application

The effect of anti-fouling marking

Register Your Company