Port | Shanghai |
Packaging | 25 kg/bucket (spraying paint) and 30 kg/bucket (screeding paint) and 0.9 ton/tray |
Lead Time | 15 days |
Density(g/cm3) | 1.7 | Cure time (min) | 28 |
Abrasion Performance / mg (200r/1000g reduce weight) | 23 | Adhesive properties | 4 grade |
Advantage:
* Excellent weather resistance;
* Anti-wear & anti-crack;
* Line film is densification and not easy to hide the dirt;
* Strong UV resistance;
* Low VOC and no heavy metal content.
Construction mode includes spraying application and screed application and extruded application.
Consumption (Actual consumption depends on the thickness of marking & Roughness of pavement & Local temperature environment )
surface temperature 25℃ |
Spraying application |
Screeding application |
Mixed mode |
thickness |
0.6mm |
1.2mm |
0.5-0.7mm |
Consumption |
1kg/㎡ |
3kg/㎡ |
Sealing coating: 2kg/㎡ Coating:1kg/㎡ |
Hardner |
15g/㎡ |
45g/㎡ |
45g/㎡ |
primer |
150g/㎡ |
150 |
Technical Data:
·Anti-fouling value:≤15
·Curing time:≤15minutes
·Density (g/cm³):1.7
·Chromaticity performance (white):≥85
·Abrasion resistance:≤35mg
·Anti wearing value:18
Color:White/Yellow /Customize other colors
Typical installation areas:
Urban Rd(very strict to the clean),mining area
The matters needing to attention during the construction
1. Dry & Clean & flat of road surface.
2. Damaged road should be repaired before applying.
3. Before applying,should add the hardner according to the ratio to the MMA two-component
(Component B) pavement marking paint,then stir well.
4. Avoid breathing vapors,eyes and skin should not touch the coating.
5. During Construction,eating and drinking and smoking is prohibited.
Attention of construction
1. Clean and dry road surface.
2. Construction environment temperature is about 10℃ to 40℃,surface temperature
generally is above 5 ℃。
3. The curing time depends on the consumption of curing agent & the temperature of
construction environment,but has nothing to do with the thickness of the coating.
4. Strictly prohibited from direct sunlight during transport and storage,stored in
ventilated and shade and dry place,the storage temperature should be controlled in 0℃
to 40℃.
5. During screeding application,it is recommended that two scraper buckets be equipped for
continous replace.
Screed application |
Spraying application |
The effect of anti-fouling marking |
Room 8819, Floor 8, Gaoke Bldg., No. 32, High-Tech Street, Taiyuan Xuefu Park, Comprehensive Demonstration Area Shanxi Province,China