Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

KII Universal Flexible Waterproof Coating

FOB Price 24.71 - 24.71 USD / barrel
MOQ10000 kg
PortEXW Chongqing
Packaging20kg/ barrel
Lead Time5days

Product Details

Place of Origin Sichuan, China (Mainland) Brand Name LianJie

Model Number K11 universal flexible waterproof coating Product name Waterproof coating

Application Kitchen,bathroom Keywords Construction waterproof coating

Color Blue Packing 20kg/barrel

Appearance Plastic bucket Material Polymer

Dosage Around1.2-1.5kg/㎡ Type Universal

Product Description

KII universal flexible waterproof coating is a waterproof material specially developed for the waterproofing of basement, toilet and other buildings on their water surface and back side. This material is composed by materials of powder and liquid. After forming, it not only has the waterproof and impermeability of polymer material, but also has the advantages of high strength, strong adhesion and water resistance of hydraulic cementing material, so it is an ideal waterproof material for buildings

Product Features

1. Construction can be processed in liquid state; It can solidify at normal temperature; operation is simple; working period is short.

2. Can be constructed on wet and complex base surface of various materials, and the coating film has strong integrity.

3. It has the properties of high strength, strong adhesion, good permeability, good water resistance.

4. It takes water as it medium. Its a green & healthy product.

Scope of application

Suitable for waterproof, moisture-proof, seepage prevention works of indoor and outdoor cement and concrete structure, brick wall structure basement, tunnel, reservoir dam, pool, toilet, bathroom, ground , etc.

Construction Guidance

1.Base surface treatment:the base surface shall be flat, clean, firm, without leakage and open water. If there are irregularities and cracks, leveling is required first.

2.Mix material of liquid and powder into a uniform state proportionally.

3.Brush slurry evenly on the treated base surface with a brush or drum. Keep intermittent stirring during construction to prevent precipitation

4.After the first brush completed, must wait until it become a little dry , the standard is just not hand-sticky, generally takes 1~2 hours. If its dry completely, which beyond the level to commit the second brush, should spray a little water to make it wet.

5.Each layer should not be too thick to facilitate maintaining and solidifying. Construction procedures should be one by another. Don’t execute new procedure until the previous procedure was completed.

Attentions

1.The construction temperature should be above 5℃, and construction cannot be carried out in rainy days.

2.The coating needs to be stirred evenly prior to use. If the latex is too viscous, Can be diluted with proper amount of water

3.Original sealed products should be placed in a warehouse where the temperature is zero above, dry and ventilated . The validity period is 12 months

4.Before the film is solidified, attention should be paid to the protection and prohibition of trample and stacking of heavy and sharp objects

Register Your Company