Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

High-elasticity Rubber-plastic Asphalt Waterproof Latex

FOB Price 26.47 - 26.47 USD / barrel
MOQ1000 kg
PortEXW Chongqing
Packaging20kg/ barrel
Lead Time5days

Product Details

Place of Origin Sichuan, China (Mainland) Brand Name LianJie

Model Number High-Elasticity Rubber plastic Asphalt Waterproof Latex Product name Waterproof Latex

Application Roof Keywords Construction waterproof coating

Color Dark chocolate Packing 20kg/barrel

Appearance Plastic bucket Material Asphalt

Dosage Around1.0-1.5kg/㎡ Type Universal

Product Description

The high-elastic rubber-plastic asphalt waterproof latex is a new water-based environment-friendly coating made of plastomer polymer as the main material, and the appearance is a viscous liquid. The coating can close the fine cracks and the capillary holes, and form a layer of lotus leaf-type waterproof film on the water-proof surface, so that the waterproof purpose is achieved

Product Features

1. Excellent bonding properties;

2. Good weather resistance

3. Excellent cracking resistance;

4. Self-healing;

5. Instant utilizing after open the cover;

6. Clean smell and environment-friendly;

Scope of application

Underground buildings (garage, subway, basement, underground passageway), roof ( balcony, Parapet), highway pavement, railway pavement, water treatment plant (reservoir, sewage pool), color steel plate, white iron roof, artificial lake, water conservancy facilities, etc.

Construction Methods

Spray, brush, roll, scrape

Attentions

1.This product is suitable for construction under the temperature of 5 ℃ 40 ℃, and the construction is not recommended in bad weather.

2.Dust and oil pollution on the construction surface should be cleaned up before construction

3.After the first brush completed, must wait until it become a little dry , the standard is just not hand-sticky, generally takes 1~2 hours. If its dry completely, which beyond the level to commit the second brush, should spray a little water to make it wet.

4.In the dark and unventilated kitchen, it is recommended to speed up the drying with fans or heating lights

5.Do not construct on the foundation surface with clear water

6.After the construction is completed, closed water test can not be carried out until the film has been thoroughly dry.

Date of Production:

Check the certificate.

Register Your Company