Quantity | 1 - 100 | 101 - 200 | 201 - 500 | 500 - 1000 |
Price | 415 | 410 | 395 | 375 |
MOQ | 1 Piece/Pieces |
Port | Port of Tianjin |
Packaging | 1. Remove the front wheel:Loosen the front wheel quickly, remove the front wheel, wrap the front wheel with bubble bag, and wrap it with tape. Open and wrap the accessories quickly; 2. Remove the handlebars:Take off the car, wrap it, and then tie it together with the frame, taking care not to miss any small accessories and tighten as much as possible to avoid falling off; 3.Wrap handlebars, front forks, frame; 4.Cover the whole car with bubble bag, and wrap the front wheel with tape in half bag; |
Lead Time | 45 days |
Speed | 7 Speed | Architectural material | Steel |
Tyre size | 20''4.0 Inch Fat Tire | Max Speed | 40-80Km/h |
Single charge time | >3 hours | Brake system | Hydraulic Disc Brake (Hydraulic Brake Pad) |
battery | Lithium Battery | voltage | 48V |
colour | custom |
No. 177, Shuangjiang Road, Shuangjie Town, Beichen District, Tianjin, China