| Quantity | 25000 - 53000 |
| Price | Dollar |
| MOQ | 1 Unit |
| Port | China |
| Packaging | Container |
| Lead Time | 15 |
| power(w) | 17.5kw | Place of Origin | Henan, China |
| Warranty | 1 Year | Video outgoing-inspection | Provided |
| Machinery Test Report | Provided | Brand Name | KUNTENG |
| Dimension(L*W*H) | 10*0.8*0.8m | Applicable raw materials | Rice husk, sawdust, coconut shell, palm shell, biomass |
| key selling points | High Productivity | Product name | corn cob wheat husk carbonization rotary kiln |
| Carbonization time | Continuous production no need to wait | Capacity | 1300kg/h can be customized |
| Fuel | Can recover exhaust gas self-sufficiency | Carbonizing rate | 88%-99% Carbonization |
| After-sale service | On site installation or video guidance | Final product usage | Making Charcoal biochar |
| Keywords | Coconut Shell Hard Charcoal Making Machine | Other name | pyrolysis furnaces |
| voltage | 220-420V can be customized | core components | PLC, Motor, pipeline, stove |
Wood chips rice husks biomass continuous rotary carbonization furnace, corn cob wheat husk carbonization equipment
Details of Battery Anode Material Carbonization Equipment:
This Battery Anode Material Carbonization Equipment used to transfer material into charcoal.Allow the material to undergo high temperature,remove impurities and obtain the final carbon portion.
And this type furnace suitable for small size material less than 20mm,like sawdust,palm shells,rice husk,peanut shell,bamboo powder etc.
Suitable for a variety of small size materials.
The Main Date of Rotary Carbonization Furnace,there are many models for your reference:
| No. | Model | Output capacity(kg/h) | Motor Power(kw) | Weight (kg) |
| 1 | φ0.8*10 M | 500 | 17.5 | 7500 |
| 2 | φ1.2*10 M | 1000 | 20 | 9200 |
| 3 | φ1.5*10 M | 1500 | 29 | 13600 |
If your raw material is small size material,such as sawdust,bamboo powder,rick husk ect.,you can refer to the below production line:Rotary charcoal furnace-Dust free grinder-Mixer-Hydraulci briquette machine-BBQ charcoal or Shisha charcoal.
This is our customer's site in Malaysia.They used local coconut husk as raw materials to make barbecue charcoal.
2023 Malaysia customer visit our factory and test the Shisha charcoal production line:
The machines for whole production line will be loaded into the 20/40 GP container directly.
1.Founded in 1999, KUNTENG Machinery is a technology-based enterprise integrating R&D, manufacturing, sales and after-sales.
2.We have our own R&D(research and development)team. We have ability design the factory building, circuit direction, and machine assemble for the entire project.
3.Wood Charcoal Carbonization Furnace is strictly controlled by the quality inspection department before loading to the container to ensure that each set of equipment work smoothly.
4.The company's products have passed more than 100 national patents, and passed passed ISO, CE quality system certification.
Our service:
Improve the added value of our products, and
let the clients free from the using
troubles:
1) Assisting the clients preparing for the
first construction scheme;
2) Installing and testing the
equipment;
3) Training the first-line operators on
site;
4) Examining the equipment
regularly;
5) Taking the initiatives to eliminate the
failure(s) rapidly at site;
6) Distributing the guarantee fittings
door-to-door;
7) Providing technical
exchanging;
8) Providing maintenance for big items.
FAQ:
1.How many days do you need to produce this
machine?
This is specially designed machine according to
your specific requirement. From engineer
designing
to production completion, It needs about 20-30
days.
2. What does your factory do regarding quality
control?
We pay much more importance to quality control
from the very begining to the end of
production. Every
machine will be fully assembled and carefully
tested before shipment.
3. What's your machine quality
guarantee?
Quality guarantee time is one year, we choose
world famous brand components to keep our
machine in
perfect working condition.
4. Are you able to give installation and
commissioning overseas? How long will it
take?
Yes, we supply overseas service, but customer
needs to pay for the engineers flight tickets
and hotel
foods.Small machine usually takes within 5
days.Big machine usually takes about 20
days.
No. 58 Yinlan Road, High tech Industrial Development Zone, Zhengzhou City, Henan Province, China