Port | Qingdao |
Packaging | Nude packaging |
Lead Time | 1 month |
URBANELITE UE520CJ-3 Crawler Excavator
PERFORMANCE
Equipped
with powerful Cummins tier II engine of large displacement,
produce strong power take-off and boost
performance.
Adoption
of advanced original Parker hydraulic control valve enables to
realize impeccable work performance on the
ground.
Re-distribution
of weight for substantial enhancement of stability and increase
of swing radius significantly improve dynamic stability and side
dynamics. Stable superstructure dramatically decreases structural
vibration during work.
Powerful
breakout force brings the rapid and perfect work performance into
play in any conditions.
EFFICIENCY
Equipped
with hydraulic pump of large flow rate and gear pump of large
capacity, operationalization in highly efficient pilot line is
realized.
Rapid
boom lifting speed and swing speed distinguish extraordinary
loading and dumping work performance.
Advanced
travel devices provide more robust travel driving force and
achieve outstanding travel performance under slope and wet
working conditions.
RELIABILITY
The
hydraulic pipelines adopt upgraded high-pressure hoses to avoid
damage and oil leakage.
Adoption
of advanced stress analysis technology and Q345 materials drives
the structure to be more reliable.
Wiring
harnesses apply waterproof and dustproof connector and enable
high security level and high reliability.
COMFORT
Expand
the area of cabin glass to greater extent. Complete all work in
360 degree direction comfortably and freely.
EPOS
operating system with advanced technology maximizes work
efficiency and reduces fuel consumption. LCD monitor adopts
multi-language and symbol display, and directly displays working
status.
The
air-conditioning system maintains comfortable driving environment
under any working conditions throughout the four seasons with
anti-frost and defrosting functions.
Adjustable
anti-vibrating suspension seat in front and rear directions,
equipped with the functions of adjusting the seat according to
driver's weight and lumbar pad.
Key
Parameters
Weight |
48.9T |
Bucket capacity |
2.4m3 |
Engine rated power |
250KW |
Flow rate |
2*355 L/min |
Swing speed |
10.3min-1 |
Travel speed (high/low) |
5.3-3.1km/h |
Ground specific pressure |
90kpa |
Gradeability (%) |
70 |
Digging force |
267KN |
Boom length |
6300mm |
Arm length |
2900mm |
Working
range
Maximum digging depth |
7795mm |
Maximum digging height |
10787mm |
Maximum dumping height |
7915mm |
Maximum digging radius |
11800mm |
Minimum turning radius |
5210mm |
Dimensions
a |
Transport length |
12230mm |
b |
Transport arm height |
3705mm |
c |
Tumblers distance |
4470mm |
d |
Radius of gyration platform end |
3800mm |
e |
Counter weight ground clearance |
1460mm |
f |
Track gauge |
3303mm |
g |
Total width of undercarriage |
3900mm |
h |
Width of upper structure |
2990mm |
i |
Width of track shoe |
600mm |
j |
Ground clearance |
770mm |
k |
Total length of travel mechanism |
6532mm |
l |
Cabin height |
845mm |
71 Chaoyang Road, Fushan District, Yantai, Shandong Province, China