MOQ | 1 Piece/Pieces |
Place of Origin | Guangdong, China, Guangdong, China | Grade | 6000 series |
Temper | T3-T8 | Application | Door & Window |
Shape | angle, Angle | Alloy Or Not | Is Alloy |
Model Number | types of aluminum profiles, types of aluminum profiles | Brand Name | SHUNTANG, SHUNTANG |
Surface treatment | Mill finish, anodizing, powder coating | powder coated: | cream white red green blue |
Products for different market | Nigeria,South Africa,Tanzania,Libya and so on | Thickness | 0.2mm to 20mm or Customized/0.7mm in base market |
length | 5.8~6m | surface treatment | anodized, powder coating, polishing |
Specification: Types of aluminum extrusion profiles for windows and door south africa
Aluminium alloy | 6063,6061,6005,6463,7075etc |
Temper | T3-T8 |
shape | square, round, flat, angle, T profile etc |
surface | Anodizing, Powder Coating, Electrophoresis, Wood Grain etc |
Deep processing ability | Drilling, Bending, Welding, Aluminium Profile Fabrication, Precise cutting etc |
Usage | Commercial Building, Windows and Doors, Machine, Furniture, Barth Room etc |
MOQ | 2 Ton Per Item |
Packing |
In General package: shrink wrap, plastic bag, Kraft paper Paper wrap .Wooden pallet in extra charge etc |
Delivery | 15-20days after sample confirmed & down payment. |
Loading port | Guangzhou, Shenzhen |
Shipping term | EXW,FOB ,CIF |
Payment term | T/T,30% Advanced deposit, the balance paid off before loading, or consulting |
Die Charge | 1, Using existing mould free of charge |
2, Customized Aluminium Profile, drawing Provide by buyer | |
3, Mould cost is negotiable base on the order quantity |
1.How do you charge the mold fee?
Incase we need to open new mold for your ordered profiles ,the mold fee will be refounded to customers when your order quantity reaches a certain amount.
2.How do you quote price ,per ton or per meter?
We provide more than two pricing modes
3.What is the differences between theoretical weight and actual weight?
Actual weight is the actual weight including packaging
Theoretical weight is identified according to the drawing,calculated by of the weight of each meter multiplied by the length of profile
4.How long it will take you to make samples?
1-2 days after the tools making in general.