Lighting solutions service | Lighting and circuitry design | Luminous Efficacy(lm/w) | 138 |
Lamp Luminous Flux(lm) | 60000 | CRI (Ra>) | 90 |
Working Temperature(u2103) | -20 - 65 | Working Lifetime(Hour) | 50000 |
Lamp Body Material | Aluminum | IP Rating | IP65 |
Certification | ce, EMC, LVD, RoHS | Place of Origin | Guangdong, China |
Brand Name | OEM | Application | Warehouse |
Light Source | LED | Warranty(Year) | 5-Year |
Color Temperature(CCT) | 3000-6000K | Lamp Luminous Efficiency(lm/w) | 120 |
Product Name | Tower crane led industrial high bay lighting, 500W led high bay light | Power | 200w 250w 300w 400w 500w |
LED Driver | Meanwell ELG-240(2PCS) | Beam Angle | 25°/60°/90° |
Housing Color | Black | Product Size | 410*300*85mm |
Installation | With square driver ,with bracket for installation | Driver Efficiency | 93% |
Input Voltage(V) | 90-305VAC or 180-305VAC |
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
A: Low MOQ, 1pc for sample checking is available
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
A: Firstly let us know your requirements or
application.
Secondly We quote according to your requirements or our
suggestions.
Thirdly customer confirms the samples and places
deposit for formal order.
Fourthly We arrange the production.
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.
Trade
Terms:
1. Payment
term: T/T 30% deposit after order confirmed, the balance after
goods ready before shipping . or L/C , or Western Union for small
amount .
2. Lead time : normally in 5~10 days after deposit
received
3. Sample policy : Samples are always availble for each model .
Samples can be ready in 3days once payment received .
4. Shipping port: Shenzhen , China
5. Discounts : We offer discount for big quantity .
Delivery
detail:
We ship goods
by UPS/DHL/FEDEX/TNT express which takes 3~ 5 days to arrive, or
by air cargo which takes about one week to arrive , or by sea
which takes about one month to arrive , depending on your actual
requirements.
The 1st Building, Xien Industrial District, No.227, Xiangshan Avenue, Yanluo Street, Baoan District