Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation
China offshore pipe laying
underwater pipe laying
Project Introduction: Jacket leg was seriously destroyed by ice fluent in winter, the new bumper breaks every year.
Work Scope: To solve the problem completely, Timeast re-design the structure, calculation and structure fabrication, offshore/subsea installation.
More information can view Hifactory.
Rm 304, Bldg E4-5, No.199, Haiyuan Middle Rd, Tanggu, Binhai New Area, Tianjin, 300459, China