Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

Small Fuel Oil 2# Diesel Fired Steam Generator Boiler(100-500kg of steam per hour)

FOB Price 1200 - 23000 USD / Set
MOQ1 Set/Sets

Quick Details (View All)

ConditionNew, New Applicable IndustriesHotels, Garment Shops, Building Material Shops, Manufacturing Plant, Machinery Repair Shops, Food & Beverage Factory, farms, restaurant, HOME USE, Retail, Food Shop, Printing Shops, Construction w
After Warranty ServiceVideo technical support, Online support Local Service Locationnone
Showroom Locationnone Video outgoing-inspectionProvided
Machinery Test ReportProvided Marketing TypeHot Product 2019
Warranty of core components1 YEAR TypeNatural Circulation
UsageIndustrial StructureFire Tube
PressureLow Pressure StyleVERTICAL
FuelOil-fired Place of OriginHenan, China
Brand NameLeway Outputsteam
Dimension(L*W*H)Refer to Model Catalogues WeightRefer to Model Catalogues
CertificationSGS, ISO, OHSAS Warranty1 YEAR
After-sales Service ProvidedEngineers available to service machinery overseas Key Selling PointsEasy to operate
ColourSliver gray Operation TypePLC Automatic Control
MaterialSpecial Boiler Steel Plate Thermal Efficiency95%
Rated Steam temperature184u2103, 194u2103 Rated Working Pressure10Bar, 12.5Bar
Rated Steam Capacity50-1000kg Lead TimeAverage 15 Days
Core Componentsleway

Product Details

 

FAQ:
1. What are the available fuel for the oil gas fired boiler?

 

Oil gas fired boiler could burn both liquid fuel and gaseous fuel. The liquid fuel could be heavy oil, light oil, diesel, furnace oil, bunker oil, LPG (liquefied petroleum gas), etc. The gaseous fuel could be natural gas, city gas, bio-gas, etc.

 

 

Q2: Why should you believe our boiler quality?

 

(1).Strength calculation report with applied materials information;

(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;

(3).100% X-ray inspection(welding seam): ensure the quality of entire boiler;

(4).Hydrostatic test: ensure the standard working pressure and safety;

(5).Third-party inspection report:By Henan Boiler Inspection Institute;

(6).Passed ISO:9001 and SGS certificate.

 

 

Q3: What about the installation and Commissioning?

 

After you receive the boiler, we will guide you to make some preparation for installation;If necessary, our expert will fly to your local place in 72 hours. The experts will responsible for guiding installation and commissioning.

Register Your Company