Warranty | More than 5 Years | After-sale Service | Online Technical Support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts, Return and Replacement |
Project Solution Capability | Graphic Design, 3D model design, total solution for projects, Cross Categories Consolidation | Place of Origin | Shandong, China |
Brand Name | HUATUO | Model Number | SPFGW-E-2001 |
Panel Material | Metal | Product name | Roof Wall Fireproof Factory Price Fiber Glass Wool Sandwich Panel |
Color | Optional as client request | Thickness | 50/75/100/150/200/250mm |
Length | as client request | Usage | Construction insulation material |
Application building part | wall or roof panels | Core material | EPS/Glass wool/Rock wool/PU |
Advantage | Fireproof/waterproof/soundproof/thermal insulation/environmental | Steel thickness | 0.3-0.8mm |
Surface treatment | PVDF Coated |
1.Common type of the industrial building?
Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other
types also could be designed and manufacturer as per clients’ request.
2.What’s the quality grade of the steel structure components?
Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure.
3.How about the delivery time?
Reply: Usually, within 45-60 days after the order confirmed, also depends on the fabrication
quantity.
4.How about the derust grade?
Reply: Ball blasting Sa 2.5 on main steel structure ;
manual derust St2.0 on secondary steel structure.
5.What kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel
performs well on the heat insulation, sound insulation. Common sandwich materials are EPS, glass wool and PU.
6.How to install it?
Reply: We will furnish you the detailed construction drawing and the construction manual
which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if needed.
7.Maintenance:
Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.