MOQ | 300 Square |
Port | Qingdao port |
Packaging | Packaging Details Packing: Flat packing, main structure packed in an integrated rack made by H beams, other parts packed in parcels, all loaded into 40FT HQ. Safe and easy handle Delivery time: 25days, some time it depends on the building area Delivery Time 30-45 days |
Lead Time | - |
Standard | GB | Grade | Q345 Q235 |
Place of Origin | Shandong, China (Mainland) | Brand Name | SANGO, SANGO |
Model Number | SG-JZ-04 | Type | Heavy, Light Steel Structure Frame |
Application | Steel Fabricated House, Steel Warehouse | System | Steel Profiles Construction |
Product | Prefab Warehouse | Roof and wall material | Rock Wool Sandwich Panel |
Color | Clients Request | Usage | 50 Years |
Loading | Wind Loads | Product name | Prefabricated Steel Structure Workshop Building |