Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

Pre Compressed Spring Hanger (25 Mm)

Product Details

Our company is a renowned Manufacturer, Exporter and Supplier of Pre Compressed Spring Hanger (25 mm) The Pre Compressed Spring Hanger is extensively used in suspension of water pipe lines and seismically restrained rotating equipment. The frame of our Pre Compressed Spring Hanger is made of G.I. Steel and powder coated to 100 microns paint thickness (exceeds 1000 hours of salt spray test), conforming to ASTM B 117 standard. Our hanger is designed with a printed deflection scale to indicate total spring deflection. We specialize in catering to the bulk requirements of Pre Compressed Spring Hanger with utmost ease.

Compliance

  • Designed to BS 1726 1 : 1987.
  • Tolerance to BS 1726-1 : 2002.
  • SAE and Ashrae Guidelines for vibration isolation

Features

  • Spring diameter to height ratios are designed to ensure that spring will never buckle even when fully loaded.
  • Suspension rod misalignment (30 degree arc) is compensated in hanger design.
  • Direct connection to lower suspension rod by means of a threaded rod coupler.
  • Printed deflection scale to indicate total spring deflectionl.
  • Pre compressed spring effectively minimizes transfer of variations in pipe load during filling of pipes thus protecting equipment connections / Flexible joints and also prevents overloading of the main equipment isolators.
  • Locking rubber bush centralizes the spring and prevents dislocation.
  • Springs are powder coated with appropriate color coding to facilitate identification.
  • Frame is made of G.I. Steel and powder coated to 100 microns paint thickness (exceeds 1000 hours of salt spray test) and conforming to ASTM B 117.

Option

  • Frame Hot dip galvanised (Prefix part Number with "HDG").
  • Spring Neoprene Coated (Prefix Part number with "N").
  • Spring Plastic coated (Prefix part Number with "P").

selection / Ordering

  • Point load (Calculated to include all variables such as weight of water in pipe lines etc if applicable).

Installation Guide Lines

  • Included in packaging.
chat with us
Register Your Company