MOQ | 10 tons |
Port | SHANGHAI |
Packaging | Steel belt hexagonal package/plastic film/woven bag/sling package |
Lead Time | 20-30days |
Product material:
A/B/X42/X46/X52
Product applied standard:
API 5L
Finished products package:
Steel belt hexagonal package/plastic film/woven bag/sling package
Product manufacturing process:
Tube blank → Inspection (spectral detection, surface inspection, dimensional inspection, and macro examination) → Sawing → Perforation → Thermal inspection → Pickling → Grinding inspection → Pickling → Lubrication → Cold drawing → Lubrication → Cold-drawing (the addition of cycled processes such as heat treatment, pickling and cold drawing should be subject to the specific specifications) → Normalization → Performance test (mechanical property, impact test, bending, flattening, and flaring) → Straightening → Tube cutting → Non-destructive testing (eddy current, and ultrasonic) → Spectral detection → Drift diameter → Hydrostatic test → Groove → Product inspection → Packaging → Warehousing
Product manufacturing equipment:
Shearing machine/sawing machine, walking beam furnace, perforator, high-precision cold-drawing machine, heat-treated furnace, and straightening machine
Product testing equipment:
Outside micrometer, tube micrometer, dial bore gage, vernier caliper, chemical composition detector, spectral detector, tensile testing machine, Rockwell hardness tester, impact testing machine, eddy current flaw detector, ultrasonic flaw detector, and hydrostatic testing machine
Product applications:
Pipeline transmission in oil and gas industry
SanHeKou Industry Area,ZhengLu Town, ChangZhou China