MOQ | 25 ton |
Port | Tianjin port |
Packaging | 3 layers of packing, inside is kraft paper, water plastic film is in the middle and ouside GI steel sheet to be covered by steel strips with lock, with inner coil sleeve . |
Lead Time | 4-8 weeks |
Steel Material Prepainting Color steel coil
Application:
Building & Construction:
Roofing; Terrace; Window Frame;
Door:
Rolling-up Door; Shutter; Mobile House;
Interior Decorations:
Wall; Door Frame; Steel Structure; Screen;
Ceiling;Elevator;
Household Appliances:
Fridge; Washing Machine; Microwave Oven; Air-Conditioner;
Duplicating Machine,etc;
Transportation:
Auto Panel; Interior Decorative Panel; Carriage
Panel;
Stock for regular products available.
Wechat/Whastapp +8617622576545
Email [email protected]