MOQ | 1000 pieces |
Port | Shanghai Port |
Packaging | STRAPPED BUNDLE WRAPPED IN PLASTIC |
Lead Time | 30 Days for OEM |
DIFFERENCE
To enhancing the productivity of MS Pipes, Calorising & Coating process is very effective. This is the most economical way for Gas blowing in steel industries.After Calorisation& Coating process, consumption rate of lance pipes will decrease 7-9 times than MS Pipes.
DETAILS:
Calorisation process is carried outside the Steel Pipe for strong griping of wearing lining of refractory and increase the fire proof properties. The total 100 to 150 micron thickness is imparted during the coating. This process is based on researches, ‘’ The most effective system is to diffuse Aluminium on the pipe surface to increase the fire proof properties’.
Supply range
Outer Diameter (mm): 21.4-60mm
Thickness(mm): 2-3mm
Length(mm): 1000-5500mm
Other: be capable of customized
Contact : cici[@]jsxrgy.com
Website : https://www.metallurgicalchina.com
Building 4,Team 9,Beiliu Village,Chengnan Industrial Park,Jingjiang City,Jiangsu Province,China.