Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

Ningbo North Area Sewage Tank Membrane Structure Project

MOQ1 sq
Packagingas customer's requirment
Lead Time30-35 days after shipment

Product Details

Ningbo North Area Sewage Tank Membrane Structure Project

Ningbo North Area Sewage Tank Membrane Structure Project is a municipal decontamination supporting project. The Sewage Membrane Structure adopts a skeleton suspension structure with a steel skeleton exposed and membrane located below, and a membrane area of 15,000 m2. The steel structure adopts a galvanized structure to ensure the maximum age of corrosion protection, and the durability of the structure is increased, and the physical and chemical properties of the membrane material are fully exerted. The use of Sewage Membrane Structure in the field of industrial decontamination has reached a new level.

We are tensile membrane structure company, provide Tensile Membrane Structure Design

We are pecialized in custom tensile membrane structure, PVDF Membrane design, tensile architecture design, tension structure installation

Register Your Company