Applicable Industries | Building Material Shops, Manufacturing Plant, Construction works | Condition | New |
Automatic Grade | Automatic | Place of Origin | Hebei, China |
Brand Name | LVJOE | Voltage | 380V/50Hz |
Power | 500-1200KW | Warranty | 1 Year |
After-sales Service Provided | Online support, Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, Video technical support | Key Selling Points | Automatic |
Installation | Pofessional Engineers | Fuel Type | Coal, Diesel, Natural Gas |
Control System | DCS Control System | Heating method | Thermal Oil, Hot Air |
Mill | Raymond | Raw material | Natural gypsum rock |
Calcining furnace | Fludized Furnace | Final product | Fineness Gypsum Powder |
Working principle | Fluidized Calciner Drying Principle | After-sales Service | Service Machinery Overseas |
natural gas automatic plaster of paris machinery plant
gypsum powder machinery
Gypsum powder production line capacity
Minimum
capacity: 4 tons per hour. Maximum capacity:
30 tons per hour
Features
of the gypsum powder production
line
The
calcination system is the key procedure of the production line.
The vertical calciner is used in the calcination system. The
main body of the calcinor is composed of delicate and intensive
radiation pipes, in which hot air goes. Hot air is made inside
the furnace by burning oil, natural gas, LPG or coal, and it
circulates between the hot air furnace and the calcinor.
At the bottom of the calcinor is mounted a Roots blower, which
blows the gypsum upwards through the space between the hot air
pipes. The gypsum powder inside the calcinor is in a boiling
state, so the calciner
is also called boiling furnace. Being heated, the gypsum powder
becomes lighter and it goes out of the
calciner
automatically.
The
advantages of this calcining
system:
Simple
structure, free of maintenance
Compact
machine, occupy less space
More
energy-saving
Gypsum
with this system has better physical characteristics and the
setting time is easy to control
Better
dust collecting result.
Typical
process of the gypsum powder production
line
Installation of the production line and training to the
operators
Engineers
and technicians from our company will be dispatched to the
installation site to instruct the installation and
commissioning work. The buyer shall supply welding workers and
fitters to cooperate in the work of installation and
commissioning. During the installation and commissioning,
the buyer's operators will be trained in respects of operating,
trouble shooting and operation by the technicians and
engineers.
Human requirement for board plant erection for your reference |
|||
|
installation |
commissioning |
|
The seller |
supervisor |
1 |
1 |
mechanical |
6 |
6 |
|
electrical |
1 |
1 |
|
total |
8 |
8 |
|
The buyer |
supervisor |
3 |
1 |
mechanical |
24 |
8 |
|
electrical |
6 |
2 |
|
total |
33 |
11 |
6 jinshua Road , Economic and Technological Development Zone Shijiazhuang City, Hebei Province. China