MOQ | 25 Ton/Tons |
Port | Rotterdam |
Packaging | LNG Tanker, LNG Tank Storage |
Lead Time | 15 days after payment |
Place of Origin | Netherlands | Brand Name | CNG-25 |
Model Number | GST 10-2450-CNG-25 | Type | LNG |
Application | Heating System | Density | Medium |
Calory (J) | 8 | Methane Content (%) | 47 |
Butane Content (%) | 5 | Ethane Content (%) | 4 |
Propane Content (%) | 38.7 | Total Water Capacity | 24.5m |
Integrated design | Strong Technical Strength |