Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016)
submarine cable installation for Bangladesh
offshore cable installation company
Project Introduction: The designed drainage quantity is 50,000 m3/d, subsea pipeline total length 9.4km (DN1000), wall thickness: 15.9mm.
Work Scope: Pipeline laying, landing, onshore valve well and pile installation, post-trenching and backfilling.
Rm 304, Bldg E4-5, No.199, Haiyuan Middle Rd, Tanggu, Binhai New Area, Tianjin, 300459, China