MOQ | 1 1000 |
Port | qingdao |
Packaging | wooden cases |
Lead Time | 10-30 days |
Z12VB.01.00 CYLINDER BLOCK ASSEMBLY
12VB.02.00 CRANKSHAFT ASSEMBLY
12VB.03.00B CYLINDER HEAD ASSEMBLY
12VB.04.00B OIL SUMP ASSEMBLY
Z12VB.05.00 PISTON AND CONNECTING ROD ASSEMBLY
Z12VB.06.00 CAMSHAFT AND GEAR TRAIN ASSEMBLY
12VB.07.00 TORISONAL VIBRATION DAMPER ASSEMBLY
Z12VB.08.00B INTAKE MANIFOLD ASSEMBLY
Z12VB.09.00B EXHAUST MANIFOLD ASSEMBLY
12VB.10.00 FUEL FILTER ASSEMBLY
12VB.11.00 ROTOR FUEL FEED PUMP ASSEMBLY
Z12V.12.00 INJECTION PUMP ASSEMBLY
Z12V.13.00 MECHANICAL GOVERNOR ASSMBLY
12VB.14.00A FUEL LINE
12VB.15.00 FUEL INJECTION PUMP TRANSMISSION
12VB.16.00E INJECTOR ASSEMBLY
12V.17.00C OIL PUMP ASSEMBLY
12VB.18.00B OIL FILTER ASSEMBLY
12VB.19.00 CENTRIFUGAL FILTER ASSEMBLY
Z12VB.22.00B LUBRICATING PIPING
12VB.21.00 OIL COOLER ASSEMBLY
12VB.22.00B WATER PUMP ASSEMBLY
12V.27.00 AFTER-COOLER ASSEMBLY
12VB.32.00D INSTRUMENT PANEL ASSEMBLY
12VB.28.00 EXPLOSION-PROOF DEVICE
12V.29.00 HAND PRIMING PUMP ASSEMBLY
12V.33.00B TACHOMETER PANEL ASSEMBLY
12VB.34.00A LOW-OIL PRESSURE SHUT DOWN DEVICE
12VB.35.00A CONTROLLING DEVICE
12VB.36M.00 AIR FILTER ASSEMBLY
12VB.38.00 RADIATOR ASSEMBLY
12VB.39.00 FAN ASSEMBLY
PZ12VB.40.00 BASE FRAME ASSEMBLY
12VB.44.00 COUPLING CLUTCH ASSEMBLY
12VB.45.00A DESERTS AIR FILTER BRACKET ASSEMBLY
12VB.46.00FB AIR STARTING SYSTEM
12VB.47.00A RADIATOR BRACKET ASSEMBLY
12VB.54.00C PRE-SUPPLYING OIL PUMP ASSEMBLY
12VB.55P.00 COUPLING CLUTCH ASSEMBLY
20GJ.00EA RADIAL FLOW TURBOCHARGER ASSEMBLY