Port | Shanghai |
Packaging | wooden |
Lead Time | 60 days |
200kg/h-6000kg/h, can according to customer's actual requirements
and space limitation of non-standard design and
manufacture.
Technology Features:
1.Reliable transmission system.
2.High strength mesh belt, full stainless steel
structure.
3.Efficient and sanitary evaporator.
4.Insulated enclosure with two sided stainless steel skin plate,
optimum air flow pattern.
5.CIP automatic cleaning system.
6.ADF automatic air defrosting.