MOQ | 1 set |
Port | Tianjin |
Packaging | Main machine directly put into the container |
Lead Time | 60 working days |
Equipment Description
1. Material:
1) Coil Width: 1000mm
2) Suitable Coil Thickness: less than 4mm
3) Suitable Raw Material: Galvanized steel sheet
2. The Chart of Process flow
De-coiler --- Roll Forming Machine------Punching device---Curving device---Automatic cutting Mechanism ---Run-out Tables
3. The equipment including
Roll forming machine |
1 set |
Hydraulic cutter |
1 set |
Bending |
1 set |
Electrical control system |
1 set |
Hydraulic system |
1 set |
Spare parts |
1 set |
Manual de-coiler |
1 set Max. loading 5 T |
4. Technical specification and details
(1) Hydraulic Ue-coiler
Un-power: manual de-coiler; Max. Capacity: 10T
Suit for coil inner diameter: 508mm, suitable coil Max. out diameter: 1000mm
Manual power expands the coil inner surface.
(2) Roll forming machine
1) Number of forming steps: 1About 20 steps
2) Material of shaft: 45# steel hardening and tempering treatment. Outer diameter 85mm ,total solid
Tolled shafts
3) Rollers: Material is high grade No.45 forged steel, with digital-controlled procession. The rollers are plated with hard chrome with thickness of 0.05mm on the surface after being machined by the exact machine tool. So that to ensure long life of forming rollers.
4) Main motor power: 22 KW with cyclical planetary gear speed reducer
5) The plating chromium’s thickness on the surface of rollers: 0.05mm
6) Main stand: 350# H steel welded structure Wall plate thickness: 14mm the main frame of machine is welded separately and the outside wall is connected by screw after being rot blasted on the surface.
7) Gearbox move the line, motor drives. All working actions are controlled by PLC electric cabinet automatically.
8) Suitable power voltage: 380V/50HZ/3Phase (can de designed according to buyer’s requirement)
9) Line working speed (Forming speed): about 15-18 m/min (without cut time)
10) Main machine motor power: about 22 KW (Depend on final design)
Dimension of the machine: 9000mmx1200mmx1200mm
5. Payment terms and after-sale service:
1) FOB Tianjin
2) Payment: 30% T/T deposit, and pay the balance before shipping.
3) Delivery time: 90 working days.
4) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
5) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
6) Installation and training:
1. If buyers visit our factory and check the machine, we will teach you how to install and us the machine, and also train your workers/technician face to face.
2. Without visiting, we will send you user manual and CD to teach you to install and operate.
3. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 100 one man one day). To the seller’s appointed account by T/T before the seller’s technicians go to the buyer’s factory. The buyer pays the seller’s technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
If you have any further question of our Equipment, please feel free to contact me, thanks!
South section of No.1 road, economic development zone, botou city