Port | Shenzhen |
Lead Time | depands on order number |
PSR-C12 | |
Feature | Typical Application |
• Compact miniature design,small size fit for harsh space; | • CCTV Monitoring System; |
• Moudle design;Meet the most of requirement; | • Electrical test equipment; |
• More install method for option; | • Medical equipment; |
• Can combine signal and power in same slip ring; | • Robotics; |
• LDS(Laser distance sensor); |
House | Engineer Plastics/Al alloy |
Contact material |
Precious
/Gold-Gold
|
Lead Wire |
12
color#28AWG Teflon wire
|
Bearing | Precision ball bearings |
Environment | |
Operation temp | -40ºC~+80ºC |
Mechanical vibration | MIL-SID-810E |
humidity |
60%
|
Mechanical Spec | |
Speed | 300Rpm |
Torque |
2g.cm/ring
|
Seal
class
|
IP54
|
FAQ:
1.Q: Are you a manufacturer or trading company?
A:Yes, we are manufacturer.Our company has 15 years of
professional experience in the telecom field, which can design,
manufacture a wide range of microwave waveguide components,
coaxial components, antennas and other telecommunication
components to global market.
2.Q: How to make an OEM order?
A: 1.We will manufacture these products based on the mechanical
drawings you provided. Some minor alterations might occur during
the process of production to ensure we can meet your electrical
specs requirements. Alternatively, we may go for the first set as
samples and see whether it meet your specification requirements.
After communication, the buyer and the seller reach an agreement
on product details, packaging, purchase quantity, unit price,
delivery time and payment terms.
2.The buyer sends a formal PO (purchase order) or the seller
sends a formal PI (proforma invoice) with detailed terms and
conditions.
3.Q: How do you solve after-sales service
issues?
A: After receiving the goods, if you have any dissatisfaction or
other issues, please contact us ASAP, we will give you a fast
response and reasonable solution.
4.Q: How long is your delivery time?
A:Usually 7-15 working days after receiving your 100% payment.
For bulk orders: 15-35 working days after receiving the
deposit.