| MOQ | 1000 Piece/Pieces |
| Port | Shenzhen |
| Packaging | Bulk packed |
| Lead Time | 20 days |
| Shape | Spur | Place of Origin | Guangdong, China (Mainland) |
| Model Number | H44 | Brand Name | PTCQ |
| Material | Sintered steel, sintered steel SMF5030 | Tolerance | ISO2768-mK |
| Initial samples lead time | 3 weeks | Surface treatment | Black oxide |
| Production method | Powder metallurgy | Part density | Min 6.8g/cm3 |
Floor 3, Bldg. 10, No. 8, 3rd Industrial Park, Tangwei Community, Gongming Street, Guangming New District, Shenzhen, Guangdong, China (Mainland)