Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

hand protection disposable plastic glove making machine

MOQ1 set
PortNingbo Port
PackagingWOODEN PACKING
Lead Time30 DAYS

Quick Details (View All)

Overall dimensions(L*W*H)2300*1190*1500mm Weight600 KG
Producing Speed40-200pcs/min TYPESJ-400

Product Details

Performance and Characteristics

The disposable glove machine is successfully researches and developed by our factory through accumulating many years of experience in the production of high and low pressure bag-making machines.Replacing the original electric heating wire model homemade equipment,it has advantages such as stable product quality,automatic control,easy to operate and maintenance. It is the ideal equipment for batch production of HD/LDPE film gloves.The main power of the machine adopts inverter motor with stable performance and low noise.The control part adopts single chip microcomputer control, and adopt stepping motor and actuator, which have such advantages as low maintenance rate and low noise.

Main Technical Variables

TYPE SJ-400
Producing Length 200-400mm
Producing width 270-330mm
Film thickness 0.008-0.02mm
Producing Speed 40-200pcs/min
Main Power 10 Kw
G. Power 4Kw
Weight 600Kg
Overall dimensions(L*W*H) 2300*1190*1500mm
item kw qty origin
Servo motor 1.5kw 1 china
Speed Controller 600W China
Unwinder Photocell 1 China
Main Motor 10kw 1 china
computer 1 china
inverter 1.5kw 1 china
Inverter 0.75kw 2 china
Feeding motor 0.37kw 2 china

TERMS & CONDITIONS:

  • Validity of Quotation:

- One Month

Delivery time:

  • Effected within 30 days from the date of signing the purchase contract and receipt of T/T affected for advance payment.
  • Loading port: Ningbo Port
  • Payment terms :
  • Effect payment by T/T in two installments exactly 30% advance payment and remaining 70% payment before shipment
  • Quality of Goods:
  • 100% brand new
  • Origin of Goods: China.
  • Packing and Marking :
  • Packing: Wooden Pallet Packing
  • Installation, Adjusting & Commissioning:
  • Installation and Adjusting: If required, the seller will dispatch the technician to your country for installation, adjusting the machine and training the workers at your plant. This price is inclusive of the fee of installation and debugging. However the buyer should take on all costs required during our technicians stay in the buyers country, including round airplane tickets, accommodation, and food .

FAQ
1. How long will your engineer reach our factory?

Within one week after machine arrival your factory.

2. How many days will you finish installing?

We will finish installation and training within 15days.

3. What should we charge for your engineer?

You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USD one day per person.

4. How long is your machine's warranty period?

All our machine have one year guarantee, starting from finished installation.

5. How could we do after one year warranty period?

We also can do service for you, but you need pay salary for my technician 100USD/day.

6. How could we do if the parts broken within warranty?

We would express the free replacement parts during the warranty date.

Register Your Company