Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

Galvalume Steel Coil, GL Aluzinc Alloy Coated Steel Coil

MOQ50 T
PortQingdao Port and Tianjin Port
Packaginginner waterproof plastic film + outer strong iron protective cover
Lead Time10-28

Quick Details (View All)

brand nameCONBYRH surface treatmcertificateentiso9001/CE
typedelivery timesteel coil lengthcustomers requirement

Product Details

器具

镀锌钢卷采用热浸镀锌或电镀锌工艺,在其表面涂覆一层保护性锌层,具有优异的耐腐蚀性和更长的使用寿命。适用于对耐候性要求较高的环境。主要应用包括:

建筑结构:轻钢框架、通风管道、电缆桥架。

汽车制造:防腐蚀部件,例如底盘护板、油箱、保险杠。

农业设施:粮仓、温室、畜牧设备。

日常五金:配电箱、仪器柜、电器外壳。

常问问题:

1. 问:镀锌钢卷(GI)的标准交货时间是多久?

A: For regular specifications (e.g., Z20-Z275g/m², commercial quality) with raw material in stock, our standard production lead time is 10-15 days for quantities up to 500 tons. For specific base metal grades (e.g., HSLA structural steel, DDQ deep drawing quality) or non-standard thicknesses that require special hot-rolled feedstock arrangement, the lead time is approximately 20-25 days. We confirm the exact shipping schedule in the Proforma Invoice to align with your project milestones, and expedited handling is available for urgent orders upon request.

2. Q: How do you ensure the zinc coating weight and long-term corrosion resistance?

A: Zinc coating integrity is the core value of galvanized steel. We strictly adhere to ASTM A653 and JIS G3302 standards:

- Coating Weight Control: Through precise air knife pressure adjustment and line speed management, we guarantee the coating weight meets the ordered designation form Z20-Z275g/m². Triple-spot testing is performed on every coil to verify uniform zinc distribution.

- Adhesion Test: We perform Zero Spangle or Minimized Spangle finish to ensure a smooth surface and excellent paint adhesion for subsequent processing. A strict bending test (T-bend) is conducted to ensure the zinc layer does not peel or crack during stamping or roll-forming.

- Substrate Compatibility: We utilize 220°C hot-dip galvanizing process and continuous annealing technology to ensure the zinc-iron alloy layer bonds firmly with the base steel, providing decades of sacrificial protection.

3. Q: What are your accepted payment terms for export orders?

A: We offer flexible payment options to facilitate secure and convenient international trade:

- T/T (Telegraphic Transfer): 30% deposit upon order confirmation, with the remaining 70% balance settled against the scanned copy of the Bill of Lading (B/L).

- L/C (Letter of Credit): We accept Irrevocable L/C at sight. For established long-term partners with solid credit standing, we are also open to negotiating Usance L/C (Deferred Payment L/C) to support your working capital requirements.

4. Q: How do you guarantee the surface quality and prevent "White Rust" during storage and transit?

答:我们在锌块到达您的仓库之前,要实施严格的防腐蚀钝化和涂油处理流程,以保护锌块表面:

- 在线处理:每个线圈均经过权威六价铬的钝化处理(符合RoHS标准),然后均匀地配制防锈油。这可起到保护屏障,有效抵御潮气和酸性大气环境的影响。

- 待海运的包装:我们采用全塑料薄膜包裹,必要时使用VCI(气相腐蚀)袋,将其固定在经过熏蒸的木托盘上,托盘边缘有护角,并有耐用的金属外罩,以防止机械损伤和海水侵入。

- 白锈预防:我们建议客户将线圈存放在干燥通风处,并在到货后3个月内进行处理。详细的储存指南随发货单据提供。

5. 问:如果发现线圈有缺陷或损坏,你们如何处理指控?

答:我们致力于以透明的方式解决问题。如果出现合理的质量问题(例如,厚度不合格、焊点偏差过大或出现分层现象),我们将提供以下补偿:更换缺陷材料、赔偿损失吨位或提供未来订单的抵扣券。

- 拍照程序:请在交货后 30 天内提交相机的照片证据和线圈识别号码。

- 政策文件:有关资格要求和处理时间表的详细概述,请访问我们官方网站的“客户服务/售后”部分,下载“出口产品质量争议解决和投诉政策”PDF。

- 运输风险:我们强烈建议购买货物海运保险,您的货物运输过程中发生损坏。我们将全力协助您准备承运人所需的文件。

6.问:贵公司的标准化生产线在透明包装方面有哪些独特的优势?

答:与纯粹的贸易公司不同,我们拥有自己的综合生产设施。这种垂直整合带来了直接的优势:

1.源头可追溯性:凭借我们自己的冷轧基材供应和连续热浸镀线,我们从始至终控制锌化学成分(铝含量)和炉内气氛,确保一致的成分力,并消除纺织加工中常见的“裸露点”或“接受剥落”的风险。

2.交货周期:冷轧和无缝之间的无缝衔接消除了高效的外部物流间歇,使我们的生产计划更加可靠,能够更好地响应大批量需求。

3.成本效率:通过内部管理整个制造链,我们消除了第三方加工加价,从而能够为同等重量和等级的产品提供具有竞争力的EXW/FOB价格。

SHANDONG CONBYTH INTERNATIONAL TRADE CO. LTD,

Xingfu Industrial Park, Boxing County, Binzhou City, Shandong Province

China

Get Free Quotes From Multiple Sellers

✓ Saved to your favorites
chat with us
Register Your Company