Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

Factory Supply pre-engineered ag buildings / hay storage buildings

FOB Price 30 - 35 USD / piece
Quantity 100 - 1000
Price 300
MOQ100 15
Porttianjin port
PackagingAccording to customer's requirement
Lead Time25days

Quick Details (View All)

Drawing designfree

Product Details

Hebei Sanjuyuan Steel Structure Engineering Co., Ltd.
In the past 16 years, Hebei sanjuyuan Steel Structure Engineering Co., Ltd. has been committed to producing high-quality steel structure building kits, prefabricated houses, chicken houses and container houses for customers from all around the world.This process includes steel structure prefabrication production, on-site installation, safe use and maintenance. From the gymnasium to the convenience store, from the industrial factory workshop to the breeding farm, from the aircraft hangar to the automobile shed.
With our professional knowledge and rich construction experience, we have safely built steel structure buildings and delivered the clients of more than 1 million square meters.View File
FAQ
1.You are manufacture factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. Also you will can get best and most competitive price after visiting us.
2.Can you send engineers or whole team to install my project?
We will give detailed installation drawings for free. We can send engineers as installation director or a team upon request.
3.Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
4. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall,5star hotel.
5.How about the delivery time?
Reply: Usually, within 20-30 days after the order confirmed, also depends on the fabrication quantity.

Get Free Quotes From Multiple Sellers

Register Your Company