The basic structure of the electromagnetic bridge crane is the same as that of the hook bridge crane. The difference is that a DC lifting electromagnetic sucker is hung on the hook, which is used to lift ferrous metals and their products with magnetic conductivity. The AC power is converted into DC power through the thyristor DC box installed in the cab, and then the DC power is sent to the electromagnetic chuck with a cable through the special cable reel on the trolley.