Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

direct selling filling machine filling valve parts beverage machinery stainless steel filling parts filling parts

Quick Details (View All)

TypeFilling Machine Applicable IndustriesManufacturing Plant, Food & Beverage Factory, Retail, Food & Beverage Shops
ConditionNew ApplicationFood, Beverage
Packaging TypeBottles Packaging MaterialPlastic
Automatic GradeAutomatic Driven TypeElectric
Voltage220v/380v Place of OriginJiangsu,China
Brand NameJiede Machinery Dimension(L*W*H)80*80*120mm
Weight3kg CertificationCE SGS ISO
Warranty1 Year After-sales Service ProvidedOnline support, Video technical support, Free spare parts, Field installation, commissioning and training, Field maintenance and repair service
Key Selling PointsEasy to Operate Namefilling valve parts

Product Details

Product Description

 

The characteristics of 1

1. Mineral water filling machine adopts advanced man-machine interface control.Quality international famous brand key components.

 

The characteristics of 2

2. Suspension bottle mouth catcher structure, which can easily change the bottle body type.By changing the valve, it can also be used as a hot filling machine.

 

The characteristics of 3

3.  Spring bottle washer can clean the inside and outside of the bottle

 

The characteristics of 4

4.High precision pressure water filling mechanism ensures the height and quality of water filling.

 

The characteristics of 5

5.Magnetic power cover device to ensure sealing and prevent cover damage.

 

The characteristics of 6

6.Quiet, rotating cover decoder will not damage the cover.Photoelectric sensor detects leaky cover, thus eliminating bottle overflow without cover.

 

The characteristics of 7

7.High efficiency air purification filter system to ensure high sanitary requirements.

 

The characteristics of 8

8.Low noise.

 

Our Services

 

1. Installation and commissioning services

  The full-time service engineer with many years of relevant experience is responsible for the installation and commissioning of the equipment to the qualified, and the acceptance equipment enters the production state.

2. Adequate parts library

  In order to reduce the cost of the customer's parts inventory and provide better and faster service, the company has prepared sufficient equipment parts and components as inventory, so you can quickly repair or maintain the required parts within two years. provide.

3. Professional technical training

  In order to ensure that your technicians can correctly understand the performance, operation and maintenance procedures of the equipment, in addition to the normal installation site technical training, we can provide users with on-site training and operation conditions to other similar production plants, and can also be held in the factory. All kinds of professional training and training will help you master techmore comprehensivenology faster and ly.

 

Register Your Company