Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

Clamp

MOQ10 sets
PortTianjin,Shanghai,Qingdao,Ningbo
PackagingSea worthy packages,wood case
Lead Time60days

Product Details

Description:

Clamp, Railway Train components, Rail transit vehicle casting part, ADI casting part

 

 

Railway Train components Material:

ASTM A897M 1400-2

 

Weight:

7kgs

 

Application:

Rail and Train/Rail transit vehicle/

 

Keywords:

Clamp, Rail Train,High Speed train,Iron based shell sand casting, ADI, Austempered Ductile Iron

 

Foundry of Origin:

Hebei, China

 

Brand Name:

OEM

 

Process:

Iron based shell sand casting +Machining

 

Heat Treatment:

Austempering/Salt bath quenching

https://www.zen-young.com/train-railway-parts/clamp.html 

Machining :

CNC +Drilling Machine

 

Procedures:

1. Incoming material inspection 2.Charge mixture 3.Moulding 4.Melting&Pouring 5.Shot blasting&grinding 6.Painting 7.Visual test 8.Machining 9.Process inspection 10.Cleaning 11.Leakage test 12.FQC 13.Packing&stocking 14.Pre-shipment inspection 15.Delivery

 

Tolerance:

+/-0.05mm or according to the customers drawing indicated

 

Inspection:

MT/UT/RT/100% Visual+100%gauge/CMM

 

Standard:

ASTM. AISI. DIN. BS. JIS. NF. AS.

 

Certification:

ISO9001/TS16949/ISO14001

 

Supply Ability:

1000 Ton/Tons per Month

  

Drawing:

Provide by customer, or design according as the sample,in the format of Pro/E, Auto-CAD, SOLIDWORK, CAXA, UG, CAD, CAM, CAE, STP, IGES, etc.

 

Mould :

Design and produced by ourselves according to provided drawings

More information you can click here

 

FAQs

1. How can I get the quotation? 

Please send us your drawing together with the weight,material and quantity requireed.

 

2. If we dont have the drawing,can you make drawing for me? 

Yes, we can scan your sample and make the drawing for your confirmation. 

 

3. What kind of file format you can read?

PDF, IGS, DWG, STEP, etc. 

 

4. How small and how big you can cast?

1kg~2000kg

 

5. What is the Rail transit vehicle casting part MOQ? 

1pc

 

6. What is the sample and order lead time? 

Sample time: 6-8 weeks including tooling construction. Order time: 4-6 weeks after sample approval, it can be flexible due to complexity or quantity.

ZEN YOUNG TECHNOLOGY HEBEI CO., LTD.

Tower A 2808-2809, No.363 South Tiyu Street, Century Central Mansion

China

Get Free Quotes From Multiple Sellers

Register Your Company