Quantity | 12,500 MT X 12 - 500,000 MT X 12 |
Price |
MOQ | 150 MT |
Port | PORT SAID PORT, EL SOKHNA PORT, ADABIYA PORT, ALEXANDRIA PORT IN EGYPT |
Lead Time | 35 DAYS AGAINST LC |
CEMENT PRICES
Validity: APRIL 5, 2023.
CEMENT PRICES
Our seller is ready, willing and able to offer the CEMENT 32.5, 42.5, 52.5 with the terms and conditions below.
ORIGIN: EGYPT (NON-SANCTIONED)
SPECIFICATION: 32.5, 42.5, 52.5
INSPECTION: SGS AT LOADING PORT
QUANTITY:
* Moq: 25,000 MT x 12
* Max: 500,000 MT x 12
Packing: SLING BAG (50 KG): (PER MT)
CEMENT 32.5
FOB: $89/MT
CIF: $124/MT
CEMENT 42.5
FOB: $91/MT
CIF: $126/MT
CEMENT 52.5
FOB: $93/MT
CIF: $128/MT
Comission: $1/MT (50/50)
PRICES SUBJECT TO MARKET CHANGE WITHOUT PRIOR NOTICE.
LARGE CONTRACTS MAY BE NEGOTIATED.
PACKING: 50 KG PP BAGS (SLING BAGS)
QUALITY: STANDARD TRANSACTION PROCEDURE
DELIVERY TIME: SHIPMENT STARTS WITHIN 10 DAYS AFTER RECEIPT OF LC CONFIRMATION FROM SELLER BANK.
SHIPMENT SCHEDULE: AFTER RECEIVING CONFIRMING LC.
PORT OF LOADING: PORT SAID PORT, EL SOKHNA PORT, ADABIYA PORT, ALEXANDRIA PORT IN EGYPT
LOADING & SHIPPING RATE: (8000 – 10000) M/T PER DAY IN PORT SAID PORT, EL SOKHNA PORT, ALEXANDRIA PORT
DISCHARGE RATE: (7000 – 7500) M/T /HOOK/SHIFT/DAY
DISCHARGE BERTH DRAFT: 11.5 M
OVERALL VESSEL LENGTH: 200 M MAX
SHIPPING DOCUMENTS:
PROCEDURES
STEP 1. Buyer issues ICPO with Company Profile and End Buyer Passport Copy and BANKING COORDINATES WITH soft probe authorization + CIS/KYC + IMPORT LICENSE + Company’s registration Copy + CONSULTANT GENEALOGY FORM + NCND with company representative passport or ID + SOFT PROBE AUTHORIZATION OR POF OR BUYERS FRESH BANK STATEMENT.
* ICPO to Seller via Bordallo Construtora Ltda.
* Seller's procedure needs to be inserted in the LOI/ICPO.
2. SELLER ISSUES PERFORMA INVOICE + DRAFT CONTRACT.
3. BUYER SIGNS, STAMPS AND RETURNS THE CONTRACT WITHIN 48 HOURS + DRAFT LC
4. BUYER AND SELLER DEPOSIT A COPY OF THE FINAL EXECUTED CONTRACT TO THEIR RESPECTIVE BANKS
5. DEAL PROCEEDS WITH CLOSING TERMS
* Seller's procedure needs to be inserted in the LOI/ICPO.
"Prices are Subject to Reconfirmation may change without prior notice”
Validity: APRIL 5, 2023.