MOQ | 20 Piece/Pieces |
Port | Xingang, Tianjin |
Packaging | The centralizer is packed by wooden box or other common package as requested |
Lead Time | 15-30 days after the prepayment |
Place of Origin | Tianjin, China (Mainland) | Brand Name | SRD |
Type | Stabilizer | Machine Type | Drilling Tool |
Certification | API, API 10D | Material | Alloy steel |
Processing Type | Casting | Use | Well Drilling |
Tpye | casing centralizer, sucker rod centralizer | colour | red, black, green |
Tool type | Cementing tool |
101, Unit 4, Bldg. 39, Sunshine Garden District 5, Dagang Oilfield