We are a Lithuania-based manufacturer of engineered oak flooring.
When it comes to our products, unfinished flooring take about 2-3 weeks, and completed floors (with the color) take about 4-6 weeks. The Technical Data Sheet will now list 120/140/160/180/200/240 as well as T&G and Click connection systems. The normal top layer is 3, however it might be 4,5. This summer, we changed a few things to help our business expand once more.
Added products from us:
1) Wood floors 2) Charred Wood 3) Acoustic Panel.