Quantity | 1 - 3 |
Price | $59000 |
MOQ | 1 set |
Port | Tianjin port |
Lead Time | 40-50 days |
Forming speed | 70m/min | Roller material | Cr12 with well heat treatment ,58-62 |
Forming Steps | 10 -12steps for forming | Driven | gear box |
Shaft material | 45# steel | Shaft diameters | 50mm |
Main power: |
7.5kw |
Panel: |
Torrist stand structure |
Forming speed: |
no stop cutting, all speed is 70m/min, with punch, it is 45m/min |
Shaft material and diameters: |
45# steel and 50mm (Made the steel for cementation) |
Roller material: |
Cr12 with well heat treatment ,58-62 |
Forming Steps: |
10 -12steps for forming |
Driven: |
gear box |
Noise: |
The gear has been polished, no noise |
Reducer: |
K-reducer |
Cutting: |
Servo follow cutting, caterpillar sliding with 1.9m guide. |
Oil add: |
Automatic add lubricating oil to the slide |
Voltage: |
380V 50HZ 3Phases |
B1106 Zhongliang plaza No.345 Youyi north street Shijiazhuang, Hebei, China