MOQ | 1 ton |
Port | shanghai |
Packaging | bulk |
Lead Time | 20 |
Usages
Heavy rail is the main component of railway track. The role of the heavy rail is to guide the locomotive wheels forward, bear the huge pressure of the wheel, and pass to the sleeper. Heavy rail must provide a continuous, smooth, and least resistance rolling surface for wheels.
GB 38kg heavy railway is mainly used for temporary transport lines and light motorcycle belt lines laid in forest areas, mines, factories and construction sites. Widely used in railway, subway, traffic track, expressway, bend, tunnel and so on.
To ensure better quality, our rails go through many tests,
including chemical composition test, tensile strength test,
hardness test and drop weight
test.
Inspection
The products supplied by us are all in strict
accordance with the ISO9001:2008 quality management system and
are well recognized by our
customers.
Our products are manufactured according to
international standards such as ISO, UIC, ASTM, DIN, BS, JIS, AS…
Every product supplied by us are strictly inspected before
shipment, we have passed inspection by SGS, BV… Our products are
not only approved by Chinese railways but also overseas railway
authorities.
Packaging &
Delivery
1. Packing: it is nude packed in bundles by
steel wire rod
2. Bundle weight: not more than 3.5MT for bulk
vessel; less than 3 MT for container
load
3.
Marks:
Color marking: There will be color marking on
both end of the bundle for the cargo delivered by bulk vessel.
That makes it easily to distinguish at the destination
port.
Tag mark: there will be tag mark tied up on the
bundles. The information usually including supplier logo and
name, product name, made in China, shipping marks and other
information request by the
customer.
If loading by container the marking is not
needed, but we will prepare it as customer
request.
4. Transportation: the goods are delivered by
truck from mill to loading port, the maximum quantity can be
loaded is around 40MTs by each truck. If the order quantity
cannot reach the full truck loaded, the transportation cost per
ton will be little higher than full
load.
5. Delivered by container or bulk
vessel
GB 38kg Heavy Rail
is the main component of railway track. Its
role is to guide the wheel of the rolling stock forward,
withstand the huge pressure of the wheel, and transferred to the
sleeper.
GB 38kg Heavy Rail
is mainly used as transportation railway rail
for heavy vehicle, and it can be also used in underground mining
and crane industry. GB 38kg Heavy Rail
is widely used in the railway track system.
Together with the cooperation with the railroad
switch, GB 38kg Heavy Rail
can make trains running without turning to the
other directions. In general,GB 38kg Heavy Rail
is consist of two parallel steel tracks and
lays steadily on the railway sleepers. With the development of
railway industry, the steel is widely used in the industry.
Compared with other materials, the steel have a larger tolerance
to bear more weight. GB 38kg Heavy Rail
can disperse the weight of the steel tracks and
keep the stability of the railway transportation. The stones
under the steel tracks can supply a elasticity to the railroad
tracks. During the common life, the steel tracks can lay on the
base made of concrete and even can be embedded into concrete.
Steel rail also can called railway track, steel railway track,
etc. Steel rail is a metal groove or ridge that holds, guides,
and reduces friction for a moving device or apparatus. It's paved
with strip steel route for driving the train, trolley, etc.The
standard steel rail usually composed by two joint bars, rails
fixed to the sleepers, rail pad under the sleepers for the road,
including roadbed, rail connection parts,
etc.
GB 38kg Heavy Rail
can provide a continuous, smooth, and least
resistance rolling surface for wheels. In electrified railway or
automatic block sections, GB 38kg Heavy Rail
can also be used as track
circuits.GB 38kg Heavy Rail
can be used as cheap rails for a disposable
line, for example, if you need to move equipment in a factory,
but the equipment is too heavy to be properly transported by car,
you can use GB 38kg Heavy Rail
to build a temporary
line.
Shanghai Bosheng Industries Co., Ltd pays great
attention to quality control and management.
Our GB 38kg Heavy Rail
is completely controlled by iso9001-2008
quality system, and we have obtained the production license of
railway products from The Ministry of Railways of China. We have
a full set of testing equipment to ensure that all of our rail
products meet customer requirements.
Shanghai Bosheng Industries Co., Ltd is an ISO
9001/2008 certified company. All processes are in accordance with
the requirements of ISO quality management system, from supplier
quality control to finished products, we are in accordance with
the standard procedures, we have strict quality control system
for suppliers:
1. Before producing
GB 38kg Heavy
Rail, we will check and test the raw materials. we
require suppliers to provide production batch number, chemical
composition, mechanical properties and other testing
indicators.
2. Our quality control inspectors take sample
sampling and batch testing after the process of
manufacturing GB 38kg Heavy
Rail, and provide raw material certificate and
other means to control the testing
process.
3.According to the different requirements
of GB 38kg Heavy
Rail, we make the corresponding physical and
chemical testing and inspection. If the results do not meet our
requirements, we will refuse to accept the materials only if they
meet our standards.
4. For semi-finished products and their
external suppliers of GB 38kg Heavy
Rail, we often organize quality control
coordination meetings and provide technical advice and guidance.
Ensure that qualified products are delivered to our customers
prior to shipment.