Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

1.4MW Coal Biomass pellet Fired Industrial Boiler

FOB Price 10000 - 60000 USD / Set
MOQ1 Set/Sets

Quick Details (View All)

ConditionNew, New Applicable IndustriesHotels, Garment Shops, Manufacturing Plant, Food & Beverage Factory, Energy & Mining, Food & Beverage Shops
After Warranty ServiceVideo technical support, Online support, Spare parts, Field maintenance and repair service Local Service LocationViet Nam, Philippines, Indonesia, Pakistan, Thailand, Malaysia, Australia, Argentina, Sri Lanka, Bangladesh, Kazakhstan, Kyrgyzstan, Tajikistan
Showroom LocationViet Nam, Philippines, Indonesia, Pakistan, Mexico, Thailand, Kenya, Argentina, South Korea, Sri Lanka, Kazakhstan, Kyrgyzstan, Tajikistan, Malaysia Video outgoing-inspectionProvided
Machinery Test ReportProvided Marketing TypeOrdinary Product
Warranty of core componentsMore than 5 years TypeNatural Circulation
UsageIndustrial StructureWater Tube
Pressure1.0-1.25 MPA StyleHorizontal
FuelCoal ,biomass Place of OriginJiangsu, China
Brand NameZOZEN OutputHOT WATER
Dimension(L*W*H)10.6*3.2*3.5m Weight25T
CertificationASME PED GB Warranty1 Year
After-sales Service ProvidedEngineers available to service machinery overseas Key Selling PointsLong Service Life
NameSZL series coal-fired hot water boiler Thermal efficiency80%
Product thermal capacity2.8-29 MW Outlet temperature95/70u2103, 115/70u2103
AdvantagesTop 1 A-Class Boiler FeatureLow Operating Cost
Available fuelBituminous coal, lean coal, anthracite Available industriesHeating, hotels, schools, hospitals
OperationAutomatic Feeding Fuel Manufacturer30 Years History
Core ComponentsWater Tube

Product Details

Product Details

Introduction

SZL series vertical dual drums chain grate water tube hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.

Recommend Products
Register Your Company