Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

1+2 Automatic tie up mask making machine (with packing function)

PortShenzhen
PackagingPackaged by standard export wooden box.
Lead Time35-45 days

Product Details

View File

View File

View File

1. PLC control.

2. Photoelectric detection positioning.

3. Printing device optional.

4. Tension control system.

5. Beautiful strong and rustproof with the aluminum alloy structure.

View File

It is an automatic machine to produce the finished surgical tie on face mask ,and welding by ultrasonic .From material feeding for produce face mask blank to welding the edge, this machine integrate 1 set face mask bank machine with 2 sets of tie on machines by the mask distribution system ,so that improved its automation . In the meawhile , machine also can box feeding automaticlly. Only 2 person are needed to operate.

View File

Machine Size 5950*3750*1600mm
Output 70-80 pcs/min
Voltage 220 V/380V
Power 2.2 KW
Pressure 0.6 Mpa
Fuselage material Aluminium alloy
Special requirement Mask size need to be fixed
Note Stracking and auto box feeding is optional
Note Optional machine, waste collector is available

View File

View File

View File

View File

View File

View File

1) Provide 24-hour service hotline.

2) Reply and find out solution within the shortest time according to customer’s requirement.

3) Provide on call service to help customer solve problems.

4) Provide free of machine installation as well as commissioning, and inform customer how to do the machine maintenance.

5) Prepare customer’s feedback tracking within one week after machine installation until meet customer’s satisfaction.

6) Provide one year guaranty and lifetime maintenance.

View File

1. Q: How is the after sales service?

A:We provide 1 year guaranty and technical support lifetime. All machine’s parts can be replaced for free within 1 year if broken(excluding error operation).

2. Q: Is it difficult to install the machine?

A: The work shop should prepare full facility such as power and air compressor. For the first installation, engineer will be sent to set machine and do the machine training as long as manual instruction. For the further problems come out, we can provide video instruction as well.

3. Q: What’s the machine lead time?

A: For the standard machines, we can delivery within 30 days. If it is customized by customer(OEM), the lead time is 35-45 days.

Register Your Company