Product Description
Product Name
|
EM032 Youth and Womens Folding Ear protection
Muffs Noise Cancelling Ear Muffs
|
Material
|
Durable ABS
|
Function
|
Noise reduction
|
Package
|
45pcs/ctn,52*42*44.5cm
|
EM032 with different unique
design
and many color for the
earcup;compact folding design for
convenient storage;replaceable ear cushions
are much cleaner after long using;using
high density foam to block sound
effectively;this earmuff is suit for both
kids and adults.
Related Products
Packing&Shipping
FAQ
1. How can I get some samples?
(1) We are honored to provide you samples for free. New
clients are expected to pay for the courier cost
(2) Regarding the courier cost: you can arrange a
international express service upon Fedex, UPS, DHL, TNT, etc.
to have the samples
(3)
Please share your needs, so we could provide you with
the better solution of the sample or the courier
cost.
2. How does your factory do regarding quality
control?
(1) We has a series AOI testing equip, electronic acoustic
device analyzer, aging tester to strictly control the product
quality
(2) The professional quality inspection and control
specialist will carefully inspect each production link,
skillful workers
inspect every detail in handing the stamping, printing,
packing process
(3) The products have been testing under international
standards and have got CE , ANSI, FCC certificates
3. Can your factory print or emboss my logo on the
products?
(1) Yes, we can print or emboss the logo on the products
(2) In addition, we can also provide a variety of customized
services such as packaging , structure, ear cup
color/pattern,function, material, ear pad type, etc
(3) About oem/odm:
Customization MOQ:
ONE
Customization from design,from sample
Full customization: color, material, construe design, logo,
pattern, function
4. What is the production time?
Quality<10 sets shipping time in 3days
Quality<1000 sets shipping time in 7 days
Quality>1000 sets shipping time in 15 days
If in-depth customization is required, the production time
will be extended by 15-30 days.Such as changing the
structure,
function, mold, etc.