MOQ | 1 Set/Sets |
Port | Qingdao, Tianjin |
Packaging | 1, Wrapped with plastic film. 2, Fixed in a wooden case. 3, Wooden case on a pallet. |
Lead Time | 10-20 days |
Place of Origin | Henan, China (Mainland) | Brand Name | Dite |
Model Number | YB-12 | Certification | ISO9001:2008 |
Standard | IEC Standard | Name | YB-12 12kv electrical substation |
Frequency | 50 Hz/60Hz | Color | As Required |
Usage | Power Distribution | OEM/ODM | Accepted |
High Voltage | 12kV | Low Voltage | 0.4kV |