Please wait while your account is being registered at Tradewheel.com Loading Spinner

Join World's Fastest Growing B2B Network

With Drawers Metal Tool Cabinets Tool Box cart Tool cabinet Trolley

FOB Price 46.2 - 49 USD / Piece
MOQ570 Piece/Pieces

Quick Details (View All)

TypeCabinet Place of OriginZhejiang, China
Brand NameOEM Model NumberOD-845936
Materialsteel Size45*24*32.5cm
product nameTool cabinet Trolley uesageIndustrial usage, home usage,etc
packingcolor box Colorred or customized
typecabinet Coating finishRed coating finish
Drawer linerProtective drawer liner package1pcs/ctn

Product Details

Product Description
Product Description
Product name  With Drawers Metal Tool Cabinets Tool Box cart Tool cabinet Trolley
Material Steel material , powder coated
Description

Top chest:
Overall size: 45x24x32.5cm
Top Tray area: 44.8x23.9x4.8cm
4 drawers: 37.8x20.9x49.5cm
weight: 6.8kgs

 

under cabinet:
Overall size: 51.5x28x63.2cm
1 drawer: 44.6x25.6x7.6cm
Panel area: 51.3x27.8x41cm
Weight : 11kgs
Steel thickness: 0.5mm Top chest was stored into cabinet when pack into carton box

Packing color box
Product N.W 18kgs
Pcs/ctn 1pcs
CTN/Size 58*34.5*69cm
Usage  With Drawers Metal Tool Cabinets Tool Box cart Tool cabinet Trolley

  

FAQ

1) When can i get the price?

   we usually quote within 24 hours after we get your inquiry.

     if you are very unrgent to get the price,please call us or tell us in your email            

     sothat we will  regard your inquiry priority.

 

2) How can i get a sample to check your quality?

 

   After price confirmation,you can require for samples to check our quality.

   if you just need a blank sample to check the design and paper qulity.

   we will provide you sample for free,as long as you afford the express freight.

 

3) How long can i expect to get the sample?

 

  After you pay the sample charge and send us confirmedfiles,the samples will be ready for  delivery 3-7 days.The samples will be sent yo you via express and arrive in 3-5 worksdays.You  can use youe express account or prepay us if you do not have an account.

 

4) How long does the whole prcedure being worked out?

 

   After you place the order ,the production handling times is about 25-45 days .we need 15 days    to prepared all the stuff then 30 days for manyfacting.

 

5) What about the transportation and delivery date?

 

  Normally we use shipment to transport the goods It is about 25-45 days.It also depends on        which coutry and port you are. It could be shorter if you need to send the goods like Asian.

  If there are some emergencies we can send the goods via air express,as long as you afford the     traffic expense. 

Register Your Company