MOQ | 100 kg |
Port | SHANGHAI |
Packaging | carton |
Lead Time | 2WEEKS |
olour:green Temperature range: operational -45℃to+50℃ Thickness:2.0± 0.2mm
1.1 holiday detection:No holidays at 15kV .
1.2 Very well suited for application on new-built pipes and for pipe coating rehabilitation.
1.3 Can be moulded onto various types of irregular shaped objects
1.4 No osmosis or underfilm migration of moisture、Resistant to many chemicals like water, salts, acids, alkalis, polar solvents, etc.
1.5 Cathodic Protection (CP) of steel structures is not affected