MOQ | 1 Set/Sets |
Port | Ningbo or Shanghai |
Packaging | 1.plastic toys mould surface of core and cavity will be covered by antirust. 2.the mould surface will be covered by butter. 3.the mould will be packed by plastic membrane 4.the mould will be put into wooden case. 5.some other spare parts will be put into the wooden ca |
Lead Time | We will deliver plastic toys mould in 30-45days |
Place of Origin | Zhejiang, China (Mainland) | Brand Name | CHENHANG MOULD, CHENHANG |
Model Number | CH-L-403 | Shaping Mode | Plastic Injection Mould |
Product Material | Steel | Product | children toy mould |
name | used plastic children toy car mould | Machine | CNC, EDM, EDW |
runner | hot/cold runner | Design Software | UG,PROE,CAD |
mould life | as custom | delivery time | 30-45days |
mould operating mode | automatically | delivery | by sea or air |
package | wooden case |