MOQ | 10 tons |
Port | Shanghai |
Packaging | On pallet, packed with HDPE bags and fixed by stretch films |
Lead Time | 7 days |
color | transparent |
PE shrink films applicable for drinks, water, fabrics and other industrial material. It can reduce cost as substitute for carboards.