Port | shenzhen |
Packaging | each part will be coating oiling to form a protective coating against rust, corrosion, etc,then packed with pearl cotton to shake proof ,after that packed in a plastc box or PE bag |
Lead Time | 7-15 days after T/T 30% deposit |
Materials | HSS, tool steels,carbide | Place of Origin: | China |
Brand Name: | YIZE | Shaping Mode: | Compression Mould |
Customized | Available | Delivery Time: | 7-15 days after T/T 30% deposit |
Application: | Mold / Machinery / Industry .etc | Surface Treatment: | Heat treatment, polishing, Ticn coating |
3/F, Factory Building,No.62, Jinghai East Road, Shatou District, Changan Town, Dongguan City, Guangdong Province, China