There is no need to carry the bench testing after we carried out overhaul maintenance of engine, reduction gearbox and water jet. They can be sent to the vessel for the installation, testing against wharf and sea trial at once. We worked such overhaul for a hundred sets which were all successful in once testing operation before returning to the ship owners.
https://www.hymarinepower.com/O-Ring-Seal-Parts.html